Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-10-14 12:33
94
Company Profile
By certification [File Integrity]
Contact:tengtian(Ms.)
Email:
Telephone:
Area:Beijing
Address:Two agency Wu Xian Cun, Chongqing, Chongqing, China (400221)
Website: http://tengtian.hnzghy.com/
| Part I | Application | 250CC Three Wheel Delivery Motor Bike |
| Technical Design | Design Max Speed | ≥60 km/h |
| Loading Capacity | 800kg | |
| Unladen Kerb Weight | 350 kg | |
| Dimension(L*W*H) | 3355x1300x1530 mm | |
| Cargo size(L*W*H) | 2m*1.4m*1m(vertical reinforcement) | |
| Frame | 50*100mm keel | |
| Track | 1050 mm | |
| Wheel Base | 2300 mm | |
| Ground Clearance | 160 mm | |
| Brake Mode | Front & back wheels, drum | |
| Transmission Type | Shaft Drive | |
| Power | 8.0 kw | |
| Cool Type | water Cooled | |
| Min.Fuel Consumption | <=354g kw.h | |
| Fuel Type | Gasoline | |
| Fuel Tank Capacity | 12 L | |
| Part II | Engine Type | Single cylinder, 4-stroke, camshaft downward |
| Displacement | 250cc | |
| Brand | Lifan Brand | |
| Engine Details | Bore Stroke | 62×49.5mm |
| Fuel Type | Gasoline | |
| Compression Ratio | 9.5:1 | |
| Rated Power &Rotating Speed | 8.0 kw /8000rpm | |
| Max.Torgue/Rotating Speed | 15 N.m /5500rpm | |
| Lowest No-Load Speed Stability | 1500±150rpm | |
| Ignition System | C.D.I. | |
| Apply to | Motor tricycle | |
| Part III | Starting System | Electric/Kick |
| Operation | Transmission Mode | Shaft drive |
| Transmission | 5 Forward &1 Reverse Gears | |
| Tire | 5.00-12 | |
| Front suspension | strengthened single arms | |
| Rear axle | Automotive big driving axle | |
| Rear suspension | 5+4 Leaf spring | |
| Gearshift Control | Manual-foot | |
| Clutch Method | Manual-hand | |
| Brake Operate Mode | Manual-Hand or Foot | |
| Part IV | Transport | By land/sea/other |
| Packaging | Port Of Loading | Chongqing/Shanghai/Other ports of china |
| Original Manufacturer | Chongqing Tengtian Group | |
| Package | SKD | |
| Loading Capacity (SKD) | 12 sets in 20GP; 38 sets in 40HQ |
|
| Delivery Time (from loading port) | 20-25 Days after receiving advance payment |